Since my last update, the scaffolding has been installed in preparation for the wood envelope. The wall elements will be moved into place with the crane and the installers will have the scaffolding to walk around on to access the exterior of the thing. Now we're just waiting for a few clear days.
Figure 39. The concrete shell has been treated against water penetration and extruded polystyrene insulation panels have been mounted. In the foreground is the roof of the technical room, soon to become the floor of the garage. Figure 40. View from the other side. Figure 41. Closer look at the ducts for the ventilation system.Sunday, January 17, 2010