The concrete foundation and retaining walls were completed before the winter holidays. Here are a couple of photos showing them at different parts of the process.
Figure 37. Concrete foundation/shell. The black stuff is a bituminous paint. Figure 38. Most of the backfilling had been done by the time I took this photo. In the foreground the top of the rainwater reservoir tank can be seen. A little patio will be built on top of the area.Sunday, January 17, 2010