Figure 31. The excavator operator checks his work against the plans from time to time.
Figure 32. The trench for the sewer pipes has been dug.
In all of Switzerland, there are almost 353 new single family homes that are Minergie-P certified. As we go through the process of having our own architect-designed (Walker Architekten) Minergie-P house built, we thought it might be of interest to some people to read about it in English. Note that at the start of the blog the house was going to be simply a Minergie house. As construction neared, changes in the plans reduced the calculated energy demand to the level of a Minergie-P house.
Figure 31. The excavator operator checks his work against the plans from time to time.
Figure 32. The trench for the sewer pipes has been dug.
Figure 30. View from the south-west, looking at the excavator sitting on the north part of the land.
A lot of things have happened over the last couple of months but I wanted to wait until the dust settled (so to speak) to do an update. It's high time for it now, as yesterday the ground preparation work started.
We hadn't had the land mowed in months and the ground cover was really quite dense so the first thing that was done was that the sod was turned over using this excavator. I think most of the top layer will be stored on the site, to be used to fill in after the construction ends. The material that is dug out from lower down will have to be transported away and dumped.