A lot of things have happened over the last couple of months but I wanted to wait until the dust settled (so to speak) to do an update. It's high time for it now, as yesterday the ground preparation work started.
We hadn't had the land mowed in months and the ground cover was really quite dense so the first thing that was done was that the sod was turned over using this excavator. I think most of the top layer will be stored on the site, to be used to fill in after the construction ends. The material that is dug out from lower down will have to be transported away and dumped.
0 comments:
Post a Comment
Thank you for your comment. It should appear here within 24 hours of posting.