As our plans currently stand we will be using electricity to cover the parts of our energy demand that are not met by either solar gain or the energy extracted from the environment via the heat pump.
In the locality where we're building the major share of the electricity supply is from nuclear power plants. About three-quarters of that is generated domestically while the remainder is purchased from abroad (most likely France). In the hydroelectric and renewable group, hydro actually accounts for most of it. Only about 0.01% of the total supply comes from sources such as wind, biomass and photovoltaic arrays.
About 2.7% of the supply comes from waste. There are facilities that incinerate garbage (Kehricht-verbrennungs-anlage = KVA, aka Müllverbrennungsanlage in Germany) and use the energy from the process to produce both electricity and also provide heat for direct use (Fernwärme which can be translated as district heat). One such facility in the region is in Turgi near Brugg and they serve a total of about 200,000 people. They generate 7.7 MW of electricity and 18 MW of thermal energy for the Fernwärme system. District heat could have been a possibility for our house[1]. The problem is that the connection costs are rather high.
[1] Using district heat would lower our weighted energy demand to 33.2 kWh/(m2·a) from the 35.7 kWh/(m2·a) calculated → here
0 comments:
Post a Comment
Thank you for your comment. It should appear here within 24 hours of posting.